Building Design

IBC “Pulkovo” design department carries out multidiscipline design of industrial and commercial buildings. Having received training in Sweden, Finland and the USA, our designers and constructors use state-of-the-art CAD systems. It allows at the design phase significantly save metal for building frame and minimizes clients’ costs. High tempo and quality of building design makes it possible to get the first metal structures ready for erection in 1.5-2 months after the beginning of the design work.

Architectural and planning decisions are made at the early stage in accordance with the design of the façade and roofing systems and rational schemes of the load-bearing frame. Façade design includes working drawings, design of sandwich panel junction, small ironware and components.


Unquestionable advantage of IBC “Pulkovo” as a developer is the fact that for design of building bearing structures we use end-to-end design technology linked in one chain with structures production. 3D modeling Hyper Steel software package allows carrying the project from the phase of initial proposal to data files of manufacturing equipment. Thereby metal structures production process is operated directly from the designer’s work place.

The use of such technology makes it possible to avoid numerous errors that are inevitable in traditional building design method. More over, it gives obvious results, namely:
- there are no discrepancies between parts of the project
- the schemes and joints are labeled automatically
- the size and weight of assembly elements are determined exactly
- there is complete visualization of assembly diagrams and joints
- is achieved high precision of joining elements


Quality of our design work is confirmed both by Russian clients and exacting foreign customers and general contractors such as Farmadule Emtunga (Sweden), Zublin (Germany), Rockwool (Danmark) and others.

One of the priority directions of IBC “Pulkovo” development is to enter into cooperation with major and medium Russian companies. IBC “Pulkovo” as a developer is ready to undertake the project appraisal and in case of its “overweighting” to re-design it free of charge. Even at this design phase the partner-company can save up to 20 per cent of total metal quantity.